Apollo

Apollo Program Summary

Apollo Program symbol

Apollo Program symbol

A discussion of the Apollo Spacecraft Program must include reference to the Mercury and Gemini Programs, not because they are manned space programs but because of the interrelationship between the programs in time, in people, in organizations and in technology. The Mercury Program had a very specific objective, namely to place a man in orbit and return him to earth. The Gemini Program’s objectives were intended to explore and develop man’s capabilities to work in space. It had more resources than Mercury in terms of increased payload and technology and was able to demonstrate and achieve most all the necessary objectives needed for an Apollo mission. Apollo had a well-defined objective; to land man on the moon and return him safely to Earth. To do so before the decade was out was just icing on the cake but a driving force none the less.

Apollo required far more hardware and software and operational capabilities than one could have ever imagined at the beginning of the space program in 1958. In hindsight, people were actually working on Apollo as early as 1959 and it became a formal program in 1960; even before Yuri Gagarin or Alan Shepard’s flights.

Needless to say, the history of Apollo is recorded in tomes filling libraries and is beyond the scope of a website. Only the summaries of missions and their primary objectives are included herein.

Unmanned Flights

Apollo-Saturn 201

Launched on February 26, 1966. Obtain flight information on the structural integrity and compatibility of the launch vehicle and spacecraft and confirm launch loads. Test the separation of the following: S-IVB stage, instrument unit (IU) and spacecraft from S-IB stage, Launch Escape Systems (LES) and boost protective cover from command and service modules (CSM) and launch vehicle, separation of the CSM from S-IVB stage, IU, and service module LEM adapter (SLA) and the Command module (CM) from service module (SM).

Obtain flight operation information and performance of the following subsystems:

  • Launch vehicle - propulsion, guidance and control, and electrical systems.
  • Spacecraft - CM heatshield; service propulsion system (SPS); Environmental control system (ECS); communications (partial);

CM reaction control system (RCS); SM RCS; stabilization control system (SCS); earth landing system (ELS); electrical power system (EPS) partial.

  • Evaluate performance of the space vehicle emergency detection system (EDS) in an open-loop configuration.
  • Evaluate the CM heatshield
  • Demonstrate the mission support facilities and operations required for launch, mission conduct, and CM recovery.
  • Recover the CM.

All primary objectives were achieved.

 

Apollo-Saturn 203

Launched before AS-202 on July 5, 1966. Evaluate performance of the S-IVB/IU stage under orbital conditions to obtain flight information on:

  • Venting and chill-down systems.
  • Fluid dynamics and heat transfer to propellant tanks.
  • Attitude and thermal control systems.
  • Launch vehicle guidance, Checkout in orbit.

All primary objectives were achieved.

 

Apollo-Saturn 202

Launched on August 25, 1966. Evaluate the CM heatshield at a high heating load.

Obtain further launch vehicle and spacecraft information on:

  • Structural integrity and compatibility.
  • Flight loads.
  • Stage separation.
  • Subsystem operations.
  • Emergency detection system operation.

All primary objectives were achieved. The Apollo 201,202 and 203 flights were controlled from MOCR 1.

 

Apollo 4 AS-501 (Note the nomenclature change)

Launched on November 9, 1967. First “all up” launch of the Saturn V. Evaluated the following Saturn V capabilities:

  • Verify prelaunch and launch support equipment compatibility with launch vehicle and spacecraft systems.
  • Demonstrate the structural and thermal capabilities of all the stages of the Saturn; S-IC, S-II and S-IVB throughout the flight sequence and envelope and their readiness for manned flight.
  • Demonstrate launch vehicle sequencing system.
  • Evaluate the performance of the emergency detection system in an open-loop configuration.
  • Demonstrate the mission support capability required for launch and mission operations to high post-injection altitudes.

All Saturn V primary objectives achieved. This was the first Apollo flight controlled from MOCR 2.

Evaluated the following Apollo Command and Service Module capabilities in the Saturn V launch environment:

  • Evaluate the performance of the spacecraft emergency detection subsystem (EDS) in the open-loop configuration.
  • Demonstrate CSM/SLA/LTA/Saturn V structural compatibility and determine spacecraft loads.
  • Determine the force, acoustic, vibration and thermal environment of the simulated LM.
  • Evaluate the thermal and structural performance of the Block II thermal protection system in a simulated lunar return, high heat load reentry.
  • Demonstrate overall SPS performance.
  • Verify the performance of the SM/RCS and CM/RCS systems.
  • Demonstrate the performance of CSM/MSFN S-band communications.
  • Measure the integrated skin and depth radiation dose within the command module.

All primary objectives were achieved.

This was the first Apollo flight controlled from MOCR 2.

 

Apollo 5 AS-204/LM-1

Launched January 22, 1968.  First unmanned flight of the Apollo Lunar Module (LM). Verified operation of the following LM subsystems:

  • Ascent propulsion system and descent propulsion system; first throttleable rocket engine fired in space.
  • Performed a simulation of a landing abort; the "fire in the hole" test.
  • Evaluated LM staging,
  • Evaluated the S-IVB/IU orbital performance.

All primary objectives achieved. This flight was controlled from MOCR 1.

 

Apollo 6 AS-502

Launched April 4, 1968. Demonstrate the structural and thermal integrity and compatibility of the launch vehicle and spacecraft and confirm launch loads and dynamic characteristics (partially accomplished). Demonstrate separation of:

  • S-II from S-IC and the S-IVB from S-II. (Both accomplished).
  • Evaluated propulsion (including S-IVB restart), guidance and control (optimum injection), and electrical system (partially accomplished).
  • Evaluate performance of the space vehicle EDS in a closed-loop configuration (accomplished).
  • Demonstrate mission support facilities and operations required for launch, mission conduct, and CM recovery (accomplished).

This flight was controlled from MOCR 2.

 

Manned Flights

Apollo 1 AS-204

Apollo 1 Crew

Apollo 1 Crew

Scheduled for launch on February 21, 1967, this was to have been the inaugural manned flight of the Apollo series, but a cabin fire during a “Plugs Out” launch rehearsal on January 27th killed all three crew members: Command Pilot Virgil I. “Gus” Grissom, Senior Pilot Ed White and Pilot Roger B. Chaffee. The tragedy was heard by the MOCR 1 team that was on-console to monitor the test. On April 24th the name “Apollo 1” was retired by NASA in commemoration of the crew. The events of that day have been written about many times. The MSOA remembers and honor them for their sacrifice.

 

Apollo 7 AS-205

Apollo 7 team

Apollo 7 team

Launched October 11, 1968. First manned Apollo after the Apollo 1 fire. An 11-day Earth-orbital test flight to check out the following:

  • Evaluated the redesigned Block II CSM
  • Practiced LM rendezvous with an S-IVB space craft adapter target.
  • Evaluated the Service Propulsion System (SPS) - made eight firings.
  • Demonstrated CSM/crew performance.
  • Evaluated mission support facilities performance.
  • Conducted the first live TV broadcast.

Completed all flight test objectives.  This was the only manned Apollo flight flown out of MOCR 1.

 

Apollo 8 AS-503

Earth Rise Apollo 8

Earth Rise Apollo 8

Launched on December 21, 1968. Demonstrated crew-space vehicle-mission support facilities performance including:

  • First crew launched on a Saturn V.
  • First crew to leave Earth and fly to the moon.
  • Demonstrated primary and backup lunar orbit rendezvous (LOR).
  • Conducted the first Translunar Injection (TLI) burn.
  • Conducted CSM navigation, communications, and midcourse corrections.
  • Assessed CSM consumables and passive thermal control.

All primary objectives achieved. This flight and all other manned Apollo flights were controlled from MOCR 2.

 

Apollo 9 AS-504

Apollo 9 Lunar Module

Apollo 9 Lunar Module

Launched on March 3, 1969. Demonstrated crew, space vehicle and mission support facilities performance during a manned Saturn V mission with CSM and LM including:

  • Demonstrate LM/crew performance.
  • Demonstrate performance of nominal and selected backup LOR mission activities, including:
  1. Transposition, docking, LM withdrawal.
  2. Intervehicular crew transfer.
  3. Extravehicular capability.
  4. SPS and DPS burns.
  5. LM-active rendezvous and docking.
  6. CSM/LM consumables assessment.

All primary objectives achieved.

 

Apollo 10 AS-505

Apollo 10 Lunar Module Snoopy

Apollo 10 Lunar Module Snoopy

Launched on May 18, 1969. This was a "dress rehearsal" for the first Moon landing and included:

  • Testing all of the components and procedures, just short of actually landing.
  • Brought the LM down to 8.4 nautical miles from the lunar surface; at the point where powered descent would begin on the actual landing.
  • Demonstrated crew-space vehicle-mission support facilities performance during a manned lunar mission with CSM and LM.
  • Evaluate LM performance in the cislunar and lunar environment.
  • Provided the MCC flight controllers and extensive tracking and control network through a rehearsal for the lunar landing.

All primary objectives achieved.

 

Apollo 11 AS-506

Apollo 11 Celebration

Apollo 11 Celebration


Apollo 11 crew

Apollo 11 crew

Launched on July 16, 1969. Perform the first manned lunar landing and return.

Detailed Objectives and Experiments included:

  • Collect a contingency lunar sample.
  • Egress from the LM to the lunar surface; perform lunar surface EVA operations, and ingress into the LM from the lunar surface.
  • Perform lunar surface operations with the EMU.
  • Obtain data on effects of DPS and RCS plume impingement on the LM and obtain data on the performance of the LM landing gear and descent engine skirt after touchdown.
  • Obtain data on the lunar surface characteristics from the effects of the LM landing.
  • Collect lunar bulk samples.
  • Determine the position of the LM on the lunar surface.
  • Obtain data on the effects of illumination and contrast conditions on crew visual perception.
  • Demonstrate procedures and hardware used to prevent back contamination of the earth's biosphere.
  • Deploy the Early Apollo Scientific Experiments Package (EASEP) and conduct experiments.
  • Obtain television coverage during the lunar stay period.
  • Obtain photographic coverage during the lunar stay period.
  • Return safely to Earth.

All primary objectives achieved.

 

Apollo 12 AS-507

Apollo 12 pad after liftoff

Apollo 12 pad after liftoff

Launched on November 14, 1969. Struck by lightning during launch; lost fuel cell power and instruments. The crew recovered with help from the MCC. Achieved a precise lunar landing at their expected location; the site of the Surveyor 3 unmanned probe. Conducted the following lunar experiments:

  • Performed selenological inspection, survey, and sampling in a mare area.
  • Deployed and activated the Apollo Lunar Surface Experiments Package (ALSEP I) which included six experiments.
  • Perform lunar surface EVA operations and collected samples.
  • Visited the Surveyor spacecraft and retrieved some parts for return.
  • Obtain photographic coverage of candidate exploration sites.

All principal objectives were achieved.

 

Apollo 13 AS-508

Apollo 13 passing by the Moon

Apollo 13 passing by the Moon


Apollo 13 landing celebration

Apollo 13 landing celebration

Launched on April 11, 1970.  The original plan was to fly to the moon and perform selenological inspection, survey, and sampling of materials in a preselected region of the Fra Mauro formation and deploy and activate an Apollo Lunar Surface Experiments Package (ALSEP). The lunar landing was aborted after an oxygen tank exploded two days later, crippling the Service Module (SM) upon which the Command Module (CM) had depended. Despite great hardship caused by limited power, loss of cabin heat, shortage of potable water, and the critical need to make makeshift repairs to the carbon dioxide removal system, the crew returned safely to Earth on April 17, 1970, six days after launch.

While none of the original mission objectives were met, the flight demonstrated the capability of Mission Control to come up with the work-arounds necessary to save the crew and the crew demonstrated their ability to cope with the situation and implement the necessary procedures to save themselves and return to Earth.

 

Apollo 14 AS-509

Apollo 14 crew

Apollo 14 crew

Launched on January 31, 1971.

  • Perform selenological inspection, survey, and sampling of materials in a preselected region of the Fra Mauro formation.
  • Deploy and activate ALSEP.
  • Evaluated the new SPS oxygen system
  • Used the Modular Equipment Transporter (MET), a pull-cart for carrying equipment and samples.
  • Obtain 94 lbs. of lunar rocks
  • Conducted CSM lunar orbit experiments including photographing Apollo 16 landing sites.

All primary test objectives were achieved.

 

Apollo 15 AS-510

Apollo 15 crew

Apollo 15 crew


Apollo 15 Lunar Rover with Jim Irwin

Apollo 15 Lunar Rover with Jim Irwin

Launched on July 26, 1971. Perform selenological inspection, survey, and sampling of materials including:

  • Exploring the lunar surface in a preselected area of the Hadley-Apennine region.
  • Deployed and activated the ALSEP surface experiments.
  • Deployed and used the first Lunar Rover.
  • Conducted two EVAs to acquire materials and conduct experiments.
  • Retrieved 170 lbs. of moon rocks

All primary test objectives were achieved.

 

Apollo 16 AS-511

Apollo 16 crew

Apollo 16 crew


Apollo 16 John Young

Apollo 16 John Young

Launched on April 16, 1972. Perform selenological inspection, survey, and sampling of material and surface features included:

  • Explore the area of the Descartes region of the lunar highlands.
  • Deployed and activated the ALSEP surface experiments.
  • Deployed and used the Lunar Rover to collect 211 lbs. of moon rocks.
  • Conducted over 20 hours of EVAs.
  • Conducted lunar orbit experiments and observations using the Scientific Instrument Module (SIM) in the Service Module (SM) to study the lunar surface and environment in great detail.
  • While in lunar orbit, the crew released a subsatellite from the Service Module (SM).
  • During the return trip to Earth, the CSM pilot performed an EVA to retrieve several film cassettes from the exterior of the SM.

All primary objectives were achieved.

 

Apollo 17 AS-512

Apollo 17 crew

Apollo 17 crew


Apollo 17 Jack Schmitt

Apollo 17 Jack Schmitt

Launched on December 7, 1972. This was the last Apollo lunar mission.

Perform selenological inspection, survey, and sampling of material and surface features in a preselected area of the Taurus-Littrow region including:

  • Three days in the Taurus–Littrow valley
  • Completed three moonwalks, taking lunar samples and deploying the ALSEP and the Surface Electrical Properties (SEP) experiments.
  • The Command Module Pilot took scientific measurements and photographs from orbit using the SIM in the SM.
  • The mission broke several records: the longest moon landing, longest total extravehicular activities, largest lunar sample, and longest time in lunar orbit.

All the primary objectives were achieved.